Garbage incineration project sites must be incorporated into the city’s incineration plant will not -www.277.cc

Waste incineration projects for the city to be included in the protection of incineration plant standards will be shut down – Beijing, Beijing News (reporter Zhao Shi) to effectively improve the level of city life garbage disposal, improve the living environment, recently, the Ministry of housing, the national development and Reform Commission, the Ministry of land, Ministry of environmental protection jointly issued "on Further Strengthening the work of city garbage disposal the opinion" (hereinafter referred to as the "opinions"), the waste incineration project sites should be included in the scope of protection of the yellow line city, prohibit the unauthorized occupation or arbitrary change of use, strictly control the surrounding facilities development and construction activities. With the rapid development of urbanization, the production of municipal solid waste continues to grow, the overall capacity of the facilities is insufficient, and there is a phenomenon of overload operation. Municipal solid waste incineration technology has many advantages, such as land saving, reduction effect, and the use of waste heat, which is widely used in the world. "Opinions" put forward, to strengthen the management of incineration facilities planning, project into the city yellow line the scope of protection of land, strengthen planning rigid, prohibit the unauthorized occupation or arbitrary change of use, strictly control the surrounding facilities development and construction activities. According to the current situation of the service area of the incineration plant and the forecast of the waste production, the scale of the facility is determined in advance, and the construction of the regional waste incineration fly ash is put forward. At the same time, to fully consider the disposal of fly ash fly ash outlet, strengthen pollution control, and actively promote the construction of industrial parks, and garbage, construction waste, kitchen waste and other different types of garbage disposal, incineration, landfill, optimize the allocation of different biological treatment process, the effective governance of the park. In addition, the opinions on the existing waste incineration plant has also been put forward for the technical process, equipment and facilities to carry out special operations management, remediation can not meet the discharge standards will be shut down according to law. According to the relevant person in charge of the Ministry of housing, since the Shenzhen municipal solid waste incineration plant in 1988 since the ignition operation, China’s waste incineration has a history of nearly 30 years of history in. According to statistics, as of the end of 2015, China’s cities have been built to run the domestic waste incineration facilities 220, incineration capacity of 21.9 tons, accounting for about 38% of the total processing capacity. – visit the flue gas recirculation technology can be energy saving and emission reduction in Beijing Chaoyang District Gaoantun circular economy industrial park since construction began in 2002, now has a set of sanitary landfill, incineration and biological treatment in one, a set of scientific research, environmental protection, education function in a Beijing city solid waste comprehensive utilization of circular economy industrial park, is currently the resources the largest kitchen waste treatment plant. Park covers an area of 2.13 hectares (30 acres), with a total investment of $120 million, the design of the processing capacity of 400 tons. Clean burning center in the park, there are 82 meters long, width of 30 meters, height of 14 meters (including underground 7 meters) of the garbage bin, the volume of more than 3.4 cubic meters, can be stored for 8.61 days of garbage. At the end of October this year, a total of 268 thousand and 900 tons of garbage, since entering the commissioning and operation of more than 2000 tons of garbage. According to.相关的主题文章: